Two-Factor Authentication
Please verify your identity to continue.
We will send a verification code to your email address.
Please click the button below to receive the code.
Help guide

Save and resume a draft

Keep unfinished content and continue editing it later.

Core

Overview

A draft stores work that is not ready to publish. Moving between planner steps is different from saving a draft; wait for the save confirmation before closing the planner.

Save and return

  1. Save as a draft

    Use the draft-save action in Post Planner and wait until it finishes successfully.

  2. Find it later

    Open Reviews & Drafts in the same organization and locate the draft.

  3. Resume editing

    Open it in Post Planner and review the restored pages, copy, media, settings, and schedules.

Before scheduling an older draft

Update dates and campaign wording, check page connections, and rerun validation. If a save fails, keep the planner open while recovering your work.

Availability and access

Core

This feature does not require an add-on, although permissions or organization settings may still apply.

Related guides